Pavement Design Proof of Concept

Configurable Pavement Layer Design

LayerMaterialThickness (mm)

*Project Area for calculations: 1000

Project Metrics

  • Total Estimated Cost:$0.00
  • Estimated Completion Time:0 hours (approx.)
  • Note: Cost and time are estimates based on mock unit costs and maximum material delivery times.

Geotechnical Inputs (Static)

  • CBR Value (Subgrade):8%
  • Soil Classification:CL - Lean Clay
  • Moisture Content:18%
  • Frost Penetration Depth:200 mm
  • Drainage Characteristics:Poor

Pavement Cross-Section

*Thickness values are scaled for visualization purposes.